Underground Storage Tank Site Investigation & Remedial Design

We have designed, constructed and operated dozens of remedial systems including soil vapor extraction systems, dual-phase extraction systems, plume containment, (groundwater extraction systems, reactive barriers, etc.), monitored natural attenuation and enhanced biodegradation.

The Source Group has extensive experience in conducting remedial projects for hydrocarbon impacted sites. Services provided include remedial approach development, design, and implementation.

Remedial designs often combine multiple technologies in concert with practical remedial goal negotiation based on the minimum RBCA derived requirements to accelerate cleanup and reduce costs.

Underground Storage Tank Site Investigation and Remedial Design includes: State fund reimbursement assistance and compliance, tank removal oversight, tank closure certification, soil boring/sampling, cone penetrometer testing (CPT) investigations, monitoring well installation/sampling, groundwater monitoring and sampling programs, geochemical and hydrogeological evaluation and testing, design and implementation of remedial pilot testing programs, in-situ and ex-situ remedial design (vapor extraction, groundwater extraction, oxidation, etc.), risk based closure analysis and negotiation.